Message: Move postpone stack to urgent stack Not Logged In (login)
 Next-in-Thread Next-in-Thread
 Next-in-Forum Next-in-Forum

Question Move postpone stack to urgent stack 

Forum: Event and Track Management
Date: 04 May, 2016
From: Evan Rand <Evan Rand>

Hi G4Experts,

I have some tracks sent (from the stepping action) to the postpone stack. I want to clear these tracks during the next event, but I can't seem to clear the postpone stack, they are always stuck in the postpone stack until the end of the simulation.

I gather I need to "ReClassify()" the stack during StackingAction::PrepareNewEvent(), but the ReClassify function only acts on the waiting stack.

How can I reclassify the postpone stack to an urgent stack (or waiting, that would be fine too).

Thanks, Evan

Inline Depth:
 1 1
 All All
Outline Depth:
 1 1
 2 2
 All All
Add message: (add)

1 None: Re: Move postpone stack to urgent stack   (Evan Rand - 11 May, 2016)
 Add Message Add Message
to: "Move postpone stack to urgent stack"

 Subscribe Subscribe

This site runs SLAC HyperNews version 1.11-slac-98, derived from the original HyperNews


[ Geant 4 Home | Geant 4 HyperNews | Search | Request New Forum | Feedback ]