Message: Re: tracking 411.8keV gamma during Au198 production Not Logged In (login)
 Next-in-Thread Next-in-Thread
 Next-in-Forum Next-in-Forum

Idea Re: tracking 411.8keV gamma during Au198 production 

Forum: Event and Track Management
Re: Question tracking 411.8keV gamma during Au198 production (Sean Turnbull)
Date: 06 Jul, 2011
From: Joel Long <Joel Long>

Hi Sean,

I would match gammas to Au198s via parent ID and by looking at the creator process for the gammas (aTrack->GetCreatorProcess()->GetProcessName()). If the parent ID is that of the neutron and the creator process is...I believe it should show up as nCapture, than it is a match, right?

Have you dug into the GNDL data to make sure that the gamma levels it has match with what you think it should have?

Hope this helps, Joel

Inline Depth:
 1 1
 All All
Outline Depth:
 1 1
 2 2
 All All
Add message: (add)

1 More: Re: tracking 411.8keV gamma during Au198 production   (Joel Long - 06 Jul, 2011)
2 Feedback: Re: tracking 411.8keV gamma during Au198 production   (Sean Turnbull - 06 Jul, 2011)
1 More: Re: tracking 411.8keV gamma during Au198 production   (Joel Long - 11 Jul, 2011)
 Add Message Add Message
to: "Re: tracking 411.8keV gamma during Au198 production"

 Subscribe Subscribe

This site runs SLAC HyperNews version 1.11-slac-98, derived from the original HyperNews


[ Geant 4 Home | Geant 4 HyperNews | Search | Request New Forum | Feedback ]